PPAP and FAI Documentation: 4 Deliverables on First Orders

Published:2026-10-22    Category:FAQ    Views:2
Short answer: Yes. First shipments are backed by a First Article Inspection (FAI) report — measured results for the characteristics on your drawing, taken from the actual parts, not from the die. Material certificates (EN 10204 type 3.1 by default) accompany every delivery, and automotive programs that require PPAP-level submission are supported with the element list built around the casting process. What you should do before tooling is ordered is state which documentation regime your industry expects, because the measurement plan that produces an FAI report is designed at the same time as the die.

What a First Article Inspection Report Contains

FAI Element What It Shows Why It Matters on Castings
Full dimensional results Every drawing characteristic measured, nominal vs. actual Confirms shrinkage compensation and CT grade behavior
Ballooned drawing Each characteristic numbered to match the results table Nothing is silently skipped — auditable by your team
Measurement method record CMM, gauge, or hand measurement per feature As-cast surfaces need the right method; CMM on rough texture misleads
Material and heat treatment evidence Chemistry, mechanical properties, process record Proves the alloy that poured is the alloy specified
Special process notes NDT, weld repair, coating records where called out The steps buyers cannot verify visually still leave paper

“Do you repeat the FAI with every shipment?” — No. FAI is a first-article event: it proves the process can produce your part. Routine shipments carry certificates of conformity and lot traceability instead. A new FAI is triggered by change — a new die, a process revision, or a tooling transfer — which is exactly when its evidence is worth having again.

FAI vs. PPAP: Same Evidence, Different Depth

Aspect FAI PPAP
Core question Does this part match the drawing? Is the whole production process in control?
Typical format AS9102 forms or supplier equivalent AIAG element package (18 elements, submission levels 1–5)
Extra evidence beyond FAI — PFMEA, control plan, process capability (Cpk), run-at-rate
Home industry Aerospace, defense, general precision Automotive and derivatives

For casting programs the practical difference is scope: FAI measures the part, PPAP additionally documents how the foundry controls the process that makes it. Automotive customers typically specify a submission level; aerospace customers typically specify AS9102 forms. Both are handled by the same inspection data — PPAP wraps more process paperwork around it.

What Ships with Your First Order

  • FAI report covering the drawing characteristics, with measurement methods named.
  • Material certificate to EN 10204 type 3.1 by default — chemistry and mechanical properties tied to the actual heat number. Type 3.2 (third-party witnessed) arranged where specified.
  • Lot traceability: heat number marked or recorded against shipped quantities, so any part can be traced back to the pour.
  • Certificate of conformity on each subsequent shipment confirming parts match the approved first article.

“Can you fill out our own FAI form instead of yours?” — Yes. Customer forms (including AS9102 Rev C layouts) are accepted; send the template with the purchase order so the measurement plan is built to match it from the first article onward.

How to Set Documentation Requirements Early

Documentation is cheapest when it is requested before tooling, not after the first shipment is already packed. Three decisions to make at quotation stage: which regime applies (FAI, PPAP level, or standard certificate pack), which characteristics are critical enough to require 100% or sampled inspection on routine orders, and whether third-party witness (3.2 certificates, NDT by an external lab) is needed. Each of these changes the measurement program and the production schedule; each is invisible to a buyer who asks after the fact — and priced accordingly.

To Summary

First shipments carry a full FAI report plus EN 10204 3.1 material certificates and lot traceability; PPAP packages are supported where automotive programs demand them, built on the same inspection data with process documentation wrapped around it. Tell us your documentation regime when you request the quotation — the measurement plan, and therefore your evidence trail, is designed the day your die is.

About ATM-Casting

ATM-Casting ships investment castings with first article inspection reports, EN 10204 3.1 certificates as standard, heat-number traceability, and certificates of conformity on every delivery. PPAP and customer-specific FAI formats are supported on programs that require them, with the inspection plan defined at tooling approval.

Chat

Chat Pre-sales Agent

Chat After-sales Agent

Chat

Request Callback

24h Callback Service

Enter your phone number and area code

Request Callback

WeChat Scan to Visit

WeChat QR Code

WeChat
Back to Top