What a First Article Inspection Report Contains
“Do you repeat the FAI with every shipment?” — No. FAI is a first-article event: it proves the process can produce your part. Routine shipments carry certificates of conformity and lot traceability instead. A new FAI is triggered by change — a new die, a process revision, or a tooling transfer — which is exactly when its evidence is worth having again.
FAI vs. PPAP: Same Evidence, Different Depth
For casting programs the practical difference is scope: FAI measures the part, PPAP additionally documents how the foundry controls the process that makes it. Automotive customers typically specify a submission level; aerospace customers typically specify AS9102 forms. Both are handled by the same inspection data — PPAP wraps more process paperwork around it.
What Ships with Your First Order
- FAI report covering the drawing characteristics, with measurement methods named.
- Material certificate to EN 10204 type 3.1 by default — chemistry and mechanical properties tied to the actual heat number. Type 3.2 (third-party witnessed) arranged where specified.
- Lot traceability: heat number marked or recorded against shipped quantities, so any part can be traced back to the pour.
- Certificate of conformity on each subsequent shipment confirming parts match the approved first article.
“Can you fill out our own FAI form instead of yours?” — Yes. Customer forms (including AS9102 Rev C layouts) are accepted; send the template with the purchase order so the measurement plan is built to match it from the first article onward.
How to Set Documentation Requirements Early
Documentation is cheapest when it is requested before tooling, not after the first shipment is already packed. Three decisions to make at quotation stage: which regime applies (FAI, PPAP level, or standard certificate pack), which characteristics are critical enough to require 100% or sampled inspection on routine orders, and whether third-party witness (3.2 certificates, NDT by an external lab) is needed. Each of these changes the measurement program and the production schedule; each is invisible to a buyer who asks after the fact — and priced accordingly.
To Summary
First shipments carry a full FAI report plus EN 10204 3.1 material certificates and lot traceability; PPAP packages are supported where automotive programs demand them, built on the same inspection data with process documentation wrapped around it. Tell us your documentation regime when you request the quotation — the measurement plan, and therefore your evidence trail, is designed the day your die is.
About ATM-Casting
ATM-Casting ships investment castings with first article inspection reports, EN 10204 3.1 certificates as standard, heat-number traceability, and certificates of conformity on every delivery. PPAP and customer-specific FAI formats are supported on programs that require them, with the inspection plan defined at tooling approval.