The Standard Pack on Every Shipment
“Is this the same pack as the first shipment?” — No, and that is the point. The first shipment carries the FAI report proving the process can make your part; routine batches carry the evidence that this specific batch was made correctly. FAI is a one-time event, the batch pack is every delivery.
Three Inspection Levels to Choose From
Once the standard pack is fixed, the depth of dimensional verification is your decision — and each level has a real cost and schedule consequence.
Special Process Records When They Apply
If your drawing calls out additional verification, those results join the batch pack as well: NDT reports (penetrant testing, radiography, or magnetic particle where specified), heat treatment charts for treated lots, weld repair records, and coating thickness data on finished parts. The principle is simple — every process step that is invisible in the delivered metal should be visible in the paperwork.
“Can we get the reports before shipment instead of with it?” — Yes. Sending the inspection pack ahead of the goods is standard practice and often preferable: your team can review evidence while the container is still on the water, and any question gets answered before parts reach your dock.
How to Specify What You Need
- Mark critical characteristics on the drawing. A “key feature” or “safety feature” flag tells the inspection plan where 100% checking earns its cost.
- Name the level at quotation. AQL sampling, critical 100%, or full CMM reports — the price difference is real, so quote it, not assume it.
- State the format you need. Spreadsheet summaries, PDF reports, or your own receiving template; data delivered in a format your team cannot use is data that goes unread.
- Set the change trigger. Agree now that a new die, process change, or drawing revision restarts the FAI-level evidence — that is the moment the batch pack’s meaning could drift.
To Summary
Each batch ships with a certificate of conformity, the heat’s material certificate, dimensional and visual inspection records, and traceability to the pour — with inspection depth (AQL sampling, 100% on critical features, or full measured reports) chosen by you at tooling approval. Special processes add their own records. Decide the level once, write it into the program, and every delivery arrives with evidence your receiving team can act on without re-measuring.
About ATM-Casting
ATM-Casting ships investment castings with a defined batch document pack — conformity certificate, material certificate, and inspection records tied to heat numbers — at the inspection level specified in your program. Measurement plans are built at tooling approval so the evidence you need is produced by the same fixtures and programs that make the parts.
Pre-sales Agent