Short answer: Every batch ships with a defined document pack: a certificate of conformity tied to the heat number, the material certificate for that pour, and the dimensional results from the batch’s inspection. On top of that baseline, you choose the depth — sampled checks with an AQL plan, 100% verification of critical characteristics, or full CMM reports with measured values per part. The right level is set at tooling approval, not negotiated shipment by shipment, because the measurement plan and the production schedule are built together.

The Standard Pack on Every Shipment

Document What It Records Why It Is Standard
Certificate of conformity (CoC) The batch matches the approved first article and the current drawing revision Your receiving inspection can accept on evidence instead of re-measuring
Material certificate Chemistry and mechanical properties of the actual heat poured Links metal properties to the batch, not to a generic datasheet
Dimensional inspection record Measured results for the characteristics in the batch’s inspection plan Proves the cast and machined dimensions held at production, not just at FAI
Visual / surface acceptance record Casting surface judged against the approved standard or sample Surface calls are visual; without a record they become arguments
Traceability sheet Heat number, production date, and batch quantity Any part can be traced back to its pour if a problem appears later

“Is this the same pack as the first shipment?” — No, and that is the point. The first shipment carries the FAI report proving the process can make your part; routine batches carry the evidence that this specific batch was made correctly. FAI is a one-time event, the batch pack is every delivery.

Three Inspection Levels to Choose From

Once the standard pack is fixed, the depth of dimensional verification is your decision — and each level has a real cost and schedule consequence.

Level How It Works Fits
Sampled inspection (AQL) Statistical sample per batch against an agreed AQL plan; results summarized High-volume commodity parts where batch risk is low
Critical-characteristic 100% Every part verified on the flagged features; other dimensions sampled Functional fits, sealing faces, safety-relevant features
Full measured reports CMM data per sampled or serial part, actual values shipped with the batch Aerospace, medical, and programs with design-change learning

Special Process Records When They Apply

If your drawing calls out additional verification, those results join the batch pack as well: NDT reports (penetrant testing, radiography, or magnetic particle where specified), heat treatment charts for treated lots, weld repair records, and coating thickness data on finished parts. The principle is simple — every process step that is invisible in the delivered metal should be visible in the paperwork.

“Can we get the reports before shipment instead of with it?” — Yes. Sending the inspection pack ahead of the goods is standard practice and often preferable: your team can review evidence while the container is still on the water, and any question gets answered before parts reach your dock.

How to Specify What You Need

  • Mark critical characteristics on the drawing. A “key feature” or “safety feature” flag tells the inspection plan where 100% checking earns its cost.
  • Name the level at quotation. AQL sampling, critical 100%, or full CMM reports — the price difference is real, so quote it, not assume it.
  • State the format you need. Spreadsheet summaries, PDF reports, or your own receiving template; data delivered in a format your team cannot use is data that goes unread.
  • Set the change trigger. Agree now that a new die, process change, or drawing revision restarts the FAI-level evidence — that is the moment the batch pack’s meaning could drift.

To Summary

Each batch ships with a certificate of conformity, the heat’s material certificate, dimensional and visual inspection records, and traceability to the pour — with inspection depth (AQL sampling, 100% on critical features, or full measured reports) chosen by you at tooling approval. Special processes add their own records. Decide the level once, write it into the program, and every delivery arrives with evidence your receiving team can act on without re-measuring.

About ATM-Casting

ATM-Casting ships investment castings with a defined batch document pack — conformity certificate, material certificate, and inspection records tied to heat numbers — at the inspection level specified in your program. Measurement plans are built at tooling approval so the evidence you need is produced by the same fixtures and programs that make the parts.

Chat

Chat Pre-sales Agent

Chat After-sales Agent

Chat

Request Callback

24h Callback Service

Enter your phone number and area code

Request Callback

WeChat Scan to Visit

WeChat QR Code

WeChat
Back to Top