Which Secondary Operations Do You Subcontract, and How Do You Control Them?
Short answer: Casting, cleanup, standard machining, and inspection stay under our roof. Operations that require dedicated equipment or licensed specialists — plating lines, PVD coating, radiographic testing, certain heat treatments — are routed to a vetted subcontractor network, because owning a line you use once a month is how quality budgets get spent twice. The control structure is what makes the distinction invisible to you: approved supplier list, written specification flow-down, first-article approval per process, incoming verification on return, and single accountability — a defect from any subcontracted step is our defect, not a handoff between suppliers.
What Stays In-House, What Goes Out
“Why not just own everything?” — Because a plating line that runs one day a month is a quality risk and a cost problem at the same time. Dedicated processors run their baths every day, control their chemistry continuously, and carry the environmental permits. The buyer’s exposure is not whether the step is subcontracted — it is whether it is controlled.
The Control Stack, Layer by Layer
- Approved supplier list. Every partner is qualified once and re-checked continuously: capability audit on entry, performance metrics on time, quality, and documentation reviewed per program. A process only moves to a new source after requalification.
- Specification flow-down. The subcontractor receives the written requirement — plating thickness and adhesion standard, NDT sensitivity and acceptance criteria, heat-treatment cycle parameters — not a label. Ambiguity does not travel down the chain.
- First-article approval per process. The first batch through any subcontracted step is verified before the production lot follows: thickness tests, property coupons, or radiographic film as applicable.
- Verification on return. Subcontracted work re-enters through inspection, not through the shipping dock. Coating thickness checks, visual acceptance, and certificate review happen before parts join your batch.
- Traceability continuity. Heat numbers and lot identity survive the round trip; your batch pack documents what happened at which partner, so the certificate trail never has a gap.
- Confidentiality flow-down. Your drawings, models, and samples move to partners only under equivalent NDA terms — the protection agreed with us extends the full length of the chain.
Who Owns a Subcontracted Defect
You do not have a subcontractor. You have one supplier. If a plating batch fails adhesion or a heat-treatment chart is incomplete, the complaint path is the standard one — containment, root cause, corrective action, replacement — and the partner’s process is corrected by us, not by you. That single accountability is the actual product of the control stack: the chain of custody may include four buildings, but the chain of responsibility contains one name.
“Can we approve or reject a named subcontractor for our program?” — Yes. Programs may require your sign-off on specific sources — common when a customer’s own auditors hold an approved-vendor list. We name the partners a program intends to use at quotation, and your approval or an alternative becomes part of the contract.
What You Should Specify to Keep Control Real
- Write the standard, not the wish. “Zinc plate, 8–12 μm, salt-spray per the stated test method” is flow-down-able; “shiny and rustproof” is not.
- Name the acceptance evidence. Say which report the step must return — thickness log, cycle chart, film number — and it will exist in your batch pack.
- Flag critical steps early. If a partner’s process is on the critical path for function, it earns first-article treatment; say so at tooling approval and the plan reflects it.
- Keep change control in the agreement. A partner substitution without your written approval is a process change, and process changes restart qualification clocks.
To Summary
Casting, machining, and inspection are in-house; plating, PVD, specialized NDT, and demanding heat treatments run through a vetted partner network — controlled by approved-supplier qualification, written specification flow-down, per-process first articles, verification on return, and confidentiality that travels the whole chain. Subcontracted never means uncontrolled, and a partner’s defect is answered as our defect, once and by one name.
About ATM-Casting
ATM-Casting manages subcontracted secondary operations through a qualified partner network with specification flow-down, first-article verification, and incoming inspection on every return, keeping traceability and confidentiality continuous across the chain. Customers may require approval of named sources at quotation stage, and partner changes are treated as formal process changes.
Pre-sales Agent
